Evergreen Solutions was hired by the Brazos River Authority to Compensation and Classification Study as well as an Organizational Review of the Reservoir System Maintenance Unit (RSMU). Evergreen reviewed and recommended changes to the existing exempt and non-exempt pay grade schedules; classification system for all employees; job descriptions; and FLSA non-exempt and exempt status of all positions. Evergreen conducted market salary and benefits surveys to determine external competitiveness, internal compression and recommend pay changes, if any. Evergreen also conducted a statistical pay equity analysis for internal equity and provided recommendations. Evergreen performed an Organizational Review of RSMU in the following areas: current and anticipated staffing levels; skill-level requirements; and associated compensation. In the end, Evergreen presented a final report to the Board of Directors that included documentation that supported the findings and recommendations derived from the salary and benefits market compensation surveys, the findings and recommendations for adjustments to the exempt and non-exempt pay grade schedule, and the findings and recommendations for adjustments to the classification system and pay equity for all employees.
Note: Evergreen has worked with the Brazos River Authority on three previous projects and was hired in 2024 to conduct a Classification and Compensation Plan Update.